Topic outline
- General
General
Lecturer : SARAJUL FIKRI MOHAMED Semester : 1 2010/2011
SynopsisThis course is to provide students with knowledge, an understanding andskills of the method of measurement for specialist works (mechanical andelectrical engineering works) and pre-cast and pre-stressed works andlandscape works based on Standard Method of Measurement of BuildingWorks Second Edition (SMM2). The topic covered will include electricalinstallations, air-conditioning installations, fire fighting installations,telecommunication system, gas and fuel gas installation system, landscapeworks and pre-cast and pre-stressed works.
This work, SBQ3314 CONSTRUCTION MEASUREMENT III by SARAJUL FIKRI MOHAMED is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 3.0 Unported License. Based on a work at ocw.utm.my.
- Topic 1
Topic 1
INTRODUCTION TO MECHANICAL & ELECTRICAL WORKS - Topic 2
Topic 2
PRIME COST SUM AND PROVISIONAL SUM - Topic 3
Topic 3
PRE-CAST AND PRE-STRESSED CONCRETE
- Topic 4
Topic 4
ELECTRICAL INSTALLATIONS - SINGLE & THREE PHASE.
- Topic 5
Topic 5
AIR CONDITIONING INSTALLATIONS - SPLIT UNIT - Topic 6
Topic 6
AIR CONDITIONING INSTALLATIONS: CENTRAL SYSTEM
- Topic 7
Topic 7
FIRE FIGHTING INSTALLATIONS : SPRINKLER, HOSE REEL & FIRE EXTINGUISHER - Topic 8
Topic 8
LANDSCAPE WORKS : SOFT LANDSCAPE - Topic 9
Topic 9
LANDSCAPE WORKS : HARD LANDSCAPE